We have prepared an updated Urban Design Framework (UDF) for the Aintree Major Town Centre.
An Urban Design Framework (UDF) is an integrated vision for the area and guides its use and development over time through urban design principles, objectives, planning and design requirements and guidelines.
It is also the framework for assessing future planning permit applications (ie development proposals).
The town centre is approximately 47 hectares in size and will be located in the suburb of Aintree that will serve the immediate and wider area as a hub for shopping, services, food, and entertainment.
The UDF is expected to create significant areas that will be set aside for retail, commercial, health and areas set aside for high amenity and high-density residential outcomes. The future town centre will also be home to a substantial increase in local jobs.
Project Status Update
In October and November 2023, we asked for feedback on the proposed draft UDF. Due to the complexity of the key matters raised in submissions by state government agencies requiring additional investigations, the UDF was placed on hold.
In collaboration with state agencies, the UDF was updated in 2025 to reflect the feedback received and the final document was completed in late August 2025.
The UDF is expected to be considered by Council in late September 2025. Once approved by Council, planning permits can be assessed against the vision and guiding principles of the UDF for works to commence.
Download and view the Draft Aintree Major Town Centre Urban Design Framework(PDF, 20MB).
Location of Aintree MTC

Consultation
The Aintree UDF was open for consultation from 16 October to 13 November 2023. Thank you to the stakeholders, landowners and interested community members who have put in a submission, attended the community consultation workshop, or called to discuss this project.
Council has reviewed all submissions and met with submitters to resolve any outstanding matters.
Background and Technical Reports
As part of the UDF process, a background report was prepared. The Background Report was finalised in August 2023 and included technical reports and modelling for traffic, drainage and flood modelling, and an economic assessment peer review which can be viewed from the links below:
For more information, please call our Strategic Planning Team on 9747 7200 or email citysupport@melton.vic.gov.au