Exford Road and Greigs Road Intersection Upgrade

  • Project scheduleConstruction expected to start mid-2026 with expected completion by mid-2027

Project overview

A new roundabout will replace the existing T-intersection to improve traffic flow and enhance safety for all road users by reducing vehicle speeds and lowering the risk of collisions. 

The bridges over Toolern Creek and the Werribee River will undergo strengthening and minor widening to allow vehicles to pass each other more safely on these bridges.  

Key features of the project

  • A new roundabout at the intersection of Exford Road and Greigs Road
  • Upgrade of the bridges over Toolern Creek and the Werribee River
  • Installation of public lighting to increase visibility and enhance safety
  • Safety upgrades including tactile line marking, concrete lip on the roundabout to slow vehicles cutting across the centre and improved signage and safety barriers.
  • Drainage improvements
  • Relocation of services such as electricity, water and communications

The designs have been finalised, and Council will be tendering for the project in late 2025 or early 2026. 

Exford Road and Greigs Road Intersection Upgrade.png

Location 

The upgrade works are located at the intersection of Greigs Road and Exford Road, Wier Views.

Exford Road and Greigs Road Intersection Upgrade full map.png

 

FAQs

How will this make the intersection safer?

The roundabout is designed to reduce vehicle speeds and lower the risk of collisions, particularly for turning movements. The project will widen the two bridges and realign approaches to improve visibility, particularly from Exford Road North.

We will install skid-resistant and tactile line markings, pavement arrows, signposts, new warning signs, rumble strips, and bridge width indicators.

We will reduce the speed limit to 60 km/h and upgrade all barriers with motorcycle protection rub rails, and close gaps in the barrier where possible.

Will we need to close the road to conduct these works?

We will have to temporarily close the intersection at times to construct the new intersection. At other stages we may need to close lanes and direct traffic via shuttle flow.

To minimise disruption, any road closures will be scheduled during school holiday periods.

We will engage with the local community regarding any road closures that will be required.

When do we expect works to start and be completed?

Works are expected to start in mid-2026 and the project is expected to be completed by mid 2027.

 