Engineering requirements for new developments and subdivision:
Non-Standard Public Lighting Fitting Policy
Non-Standard Public Lighting Fitting Policy
Public Lighting Guidelines
The Non-Standard Public Lighting Fitting Policy has been developed to outline the criteria for the approval of non-standard public lighting fittings within new subdivisional developments. The policy also set out the fee structure paid to Melton City Council by developers for the non-standard public lighting fittings.
- type of non standard public lighting poles
- type of non standard public lighting luminaires
- installation costs and non standard public lighting fees
Water Sensitive Urban Design Guidelines
Water Sensitive Urban Design Guidelines - Addendum
Water Sensitive Urban Design Guidelines
The Water Sensitive Urban Design (WSUD) Guidelines set out Melton City Council's expectation for WSUD projects within the municipality, to inform developers and consultants. The document provides information on the approval process, design considerations, suitability of WSUD types in different conditions and consideration of construction, protection, maintenance and handover of the WSUD assets.
- pre application consultation
- submission of conceptual design
- submission of detailed design
- climate data
- source node rainfall runoff parameters
- Melton Council approved water sensitive urban design treatment types
- maintenance regimes
On-site stormwater detention guidelines
On-site Stormwater Detention Guidelines
The On-site Stormwater Dentention Guidelines have been produced in response to further developments that contains more hard standing or impervious area within the site than what was originally designed for in the initial overarching Estate, which thereby necessitates a system to limit the peak rate of stormwater runoff prior to entering Melton City Council drains
- on-site Stormwater Detention Design and Construction Parameters
- information required for submission to Melton Shire Council
- post development documents